Masonry & Riprap Estimator

Ad Space
Project Information
Project Engineer
Project Location
1. Masonry Works (CHB)
Calculates hollow blocks, mortar (laying), and plastering.
Show Calculation Logic
Standard: 12.5 blocks per m².
Formula: Net Area = (H × L) - Awindows - Adoors.
Mortar: 4" (0.53 bags/m²), 6" (1.02 bags/m²).
Plaster (Class B): 0.294 bags/m² per face.
Wall Height (H)m
Wall Length (L)m
Window Areasq.m
Door Areasq.m
Breakage %%
Block Size
Plastering

Net Wall Areasq.m
Total CHBpcs
Mortar Cementbags
Mortar Sandcu.m
Plaster Cementbags
Plaster Sandcu.m
Wall Detail Piling CHB Plastering
Figure 1: CHB Wall & Mortar Joints
2. Grouted Riprap Works
Volume calculation for trapezoidal slope protection (Class A Mortar).
Show Calculation Logic
Formula: Volume = ½(W1 + W2) × H × L.
Factors: Cement (2.611 bags/m³), Sand (0.1444 m³/m³), Boulders (1.0 m³/m³).
Height (H)m
Top Width (W1)m
Bottom Width (W2)m
Length (L)m

Total Volumecu.m
Boulderscu.m
Cement (Grout)bags
Sand (Grout)cu.m
Riprap Details
Figure 2: Riprap Cross Section

About this Calculator

This tool estimates materials for masonry and slope protection works according to Philippine construction standards.

References

  • Simplified Construction Estimate by Max Fajardo Jr.
  • CONST_ESTIMATE_MADE_EASY_BY_ENGR_CAJILLA.xls

Usage Guide

Enter the dimensions of your wall or slope. Adjust waste percentage as needed. Click "Recalculate" to update the Bill of Materials.

Disclaimer: For estimation purposes only. Verify with a licensed engineer.