A device intended for the protection of personnel that functions to de-energize a circuit or portion thereof within an established period of time when a current ground exceeds some predetermined value that is less than that required to operate the overcurrent protective supply circuit.
AGrounding conductor
BGrounding-fault circuit interrupter
CGrounding conductor equipment
DGround-fault protection of equipment
#22📘 EE Pocket Reviewer RojasEasy
The equipment grounding conductor of a branch circuit shall be identified by what color?
AGreen
BBlack
CWhite
DGray
#23📘 EE Pocket Reviewer RojasEasy
What is the maximum operating temperature of type UF conductor?
A75 deg C
B90 deg C
C60 deg C
D110 deg C
#24📘 EE Pocket Reviewer RojasEasy
In RA 9136, what is CREM stands for
ACompetitive Retail Electricity Market
BCompetitor Retail Electricity Market
CCompetitive Retail Energy Market
DCompetitor Retail Energy Market
#25📘 EE Pocket Reviewer RojasEasy
In RA 9136, what is SGC stands for
ASuccessor Generating Company
BSuccessor Generation Company
CSpecial Generating Company
DSpecial Generation Company
#26📘 EE Pocket Reviewer RojasEasy
Article II of Code of Ethics for Electrical Engineers contains
ASec 1-8
BSec 1-7
CSec 1-6
DSec 1-9
#27📘 EE Pocket Reviewer RojasEasy
What rules are included in Article V of RA 7920?
ARule 1-10
BRule 11-20
CRule 21-27
DRule 28-34
#28📘 EE Pocket Reviewer RojasEasy
A carwash is classified as
AWet location
BDry location
CDamp location
DMoist location
#29📘 EE Pocket Reviewer RojasEasy
Installations underground or in concrete slabs or masonry in direct contact with the earth.
AWet location
BDry location
CDamp location
DMoist location
#30📘 EE Pocket Reviewer RojasEasy
A conducting connections, whether intentional or accidental, between an electrical circuit or equipment and the earth, or to some conducting body that serves in place of the earth.
AGrounded
BGround
CShort
DFault
#31📘 EE Pocket Reviewer RojasEasy
Which of the following is not a fundamental rule in PEC?
AConstruction rule
BWiring rule
CInstallation rule
DManufacturing rule
#32📘 EE Pocket Reviewer RojasEasy
The executive officer of the Board of Electrical Engineering is ____
APRC Commissioner
BChairman of the Board of EE
CCivil Service Commission
DIIEE President
#33📘 EE Pocket Reviewer RojasEasy
What is the Article II of Code of Ethics for Electrical Engineers?
ARelations with client and employer
BRelations with fellow engineers
CProfessional life
DPenal provisions
#34📘 EE Pocket Reviewer RojasEasy
RA 7920, Rule 2(o) defines?
AIIEE
BDECS
CCHED
DPRC
#35📘 EE Pocket Reviewer RojasEasy
Which location may be temporarily subject to dampness or wetness?
ADry
BDamp
CMoist
DWet
#36📘 EE Pocket Reviewer RojasEasy
According to RA 7920 the members of the BEE shall hold office for a term of ____ years from the date of appointment or until their successors shall have been appointed and qualified.
A6
B4
C3
D5
#37📘 EE Pocket Reviewer RojasEasy
May is declared as the electrical safety month in virtue of ____ signed by Pres. Benigno Aquino III last June 27, 2011 for the reason of informing the public of the real reason of faulty electrical wiring.
ARA 7920
BProclamation no. 193
CProclamation no. 183
DRA 184
#38📘 EE Pocket Reviewer RojasEasy
EPIRA is RA 9136 which means ____
AElectric Power Installation Reform Act
BEnergy Power Isolation Reform Act
CElectric Power Industry Reform Act
DEnergy Power Institution Reliability Act
#39📘 EE Pocket Reviewer RojasEasy
This refers to energy-consuming equipment including motors, heaters, furnaces, light sources and other devices which utilize electric energy, for any purpose.
AIndustrial plant
BUtilization equipment
CProcessing plant
DTransformer
#40📘 EE Pocket Reviewer RojasEasy
A wire or cable carrying electric current, supported by pols, tower of other structures, but not including vertical or lateral connecting wires