Electrical Engineering · Question Bank

Electrical Power Plant

6 of 195 questions match. Answer in your head first, then check the solution.

✕ Clear filters
#1📘 1001 RojasHard
A hydroelectric power plant is to be constructed. The place has an annual rainfall of 190 cm. The available catchment area is 250 sq. km with an available head of 30 meters. On the average, only 85% of the rainfall can be collected in and 70% of the impounded water is available for power. Assuming turbine and generator efficiencies of 80% and 92% respectively, what will be the average power generated.
A2,637.5 kW
B1,732.7 kW
C1,941.2 kW
D2,063.8 kW
#2📜 EE Board October 1989📘 1001 RojasHard
A coal fired Power Plant with 3000 kW rated capacity costs P 15,000 per kW installed. Annual operating cost P 12 million; annual maintenance cost P 8 million; annual depreciation P 15 million; interest on investment per year 8% and cost of coal P 800 per ton. If one pound of coal is needed to generate 1 kW-hr, find the total annual cost to operate the plant. Plant capacity factor is 50%.
AP 46.45 million
BP 43.38 million
CP 40.28 million
DP 42.32 million
#3📜 EE Board April 1990📘 1001 RojasHard
A certain power plant has reserve capacity above the peak load of 10 MW. The annual factors are load factor = 59%, capacity factor = 41% and use factor = 46%. Determine installed capacity.
A33.45 MW
B31.85 MW
C32.77 MW
D30.47 MW
#4📜 EE Board April 1990📘 1001 RojasHard
A certain power plant has reserve capacity above the peak load of 10 MW. The annual factors are load factor = 59% capacity factor = 41% and use factor = 46%. Determine hours per year not in service.
A952 hours
B965 hours
C924 hours
D937 hours
#5📜 EE Pre-Board August 2013📘 PowerhouseHard
A certain power plant has a reserve capacity of 10 MW above the peak load. The annual factors are load factor = 59%, capacity factor = 41% and use factor = 46%. Determine the hours per year not in service.
A952 hours
B965 hours
C924 hours
D937 hours
#6📜 EE Pre-Board March 2017📘 PowerhouseHard
A hydroelectric generating station is supplied from a reservoir of capacity 6,000,000 m 3 at a head of 170 m. Assume hydraulic efficiency of 80% and electrical efficiency of 90%. The fall in the reservoir level after a load of 15 MW has been supplied for 3 hours, if the area of the reservoir is 2.5 km 2 is closest to
A5.39 cm
B4.32 cm
C5.98 cm
D4.83 cm

More Electrical Engineering topics