Short Circuit Simulator

Draw the single-line diagram of a house — from the utility or a solo transformer down to the panels, breakers, motors and loads — and calculate the fault current at every bus by IEC 60909 or ANSI / IEEE Std 551. Single-phase, three-phase, or both.

How to use the simulator
  1. Place equipment. Pick a tool from the toolbar, then click on the canvas. Every system starts at a Utility source or a Generator. For a house tapping the utility's secondary line, either draw the utility transformer, or set the Utility source to a low-voltage single-phase system and enter the fault current available at the tap.
  2. Connect. Drag from one terminal dot to another. The Cable / Connector switch in the toolbar sets what new links are. Cables carry impedance from the PEC conductor table; connectors are zero-impedance jumpers.
  3. Single-phase taps. To take a single-phase branch off a three-phase or 120/240 V bus, select the link and set its Phase tap: A-N for 230 V from a 400/230 V system, or A-B for 230 V line-to-line from a 115/230 V centre-tapped secondary.
  4. Breakers and switches sit between a bus or panel and the outgoing cable. Enter each breaker's interrupting rating; the simulator checks it against the fault current at its line side.
  5. Choose the method in Study settings (click an empty part of the canvas), then press Run short circuit.

Method notes. Each phase and neutral conductor is modelled separately, so single-phase, three-phase and mixed systems are solved directly. IEC 60909-0 uses the equivalent voltage source c·Un at the fault, KT and KG impedance corrections, motor R/X = 0.42 (LV), and the κ peak factor (method B when more than one source contributes). ANSI / IEEE Std 551 (first-cycle, C37.13 low voltage) uses the prefault voltage, motor reactance multipliers (1.67 below 50 hp, 1.2 for 50–1000 hp), and breaker multiplying factors from the test X/R ratios in Table 10-1. Centre-tapped transformers use the half-winding model (ZH = 0.5R + j0.8X, ZX = R + j0.4X), which gives the 1.5R / 1.2X line-to-neutral factors in the Bussmann handbook. Conductor data: PEC 2017 Table 10.1.1.9.

Start with a Utility source or load a template. Pick a tool and click on the canvas to place it, then drag between terminal dots to connect.

For preliminary design and checking only. Results are bolted-fault values based on the data you enter and typical conductor data from the PEC. Verify against utility-supplied fault levels, transformer test reports and manufacturer data before choosing equipment ratings. References: IEC 60909-0; IEEE Std 551-2006 (Violet Book); Cooper Bussmann, Short Circuit Current Calculations; Philippine Electrical Code Part 1 (2017) Table 10.1.1.9.