How to useHoles card 2 Parts card 3 Assemblies card 4 (opt.) Geometry card 7: place Loading card 8: attach This calculator builds the load tree of a single unguyed monopole (steel, concrete, wood or FRP) and finds its groundline moment (GLM) and the equivalent tip load — the horizontal force applied near the top that gives the same moment. Pole suppliers rate poles by that tip load, so it is the number to compare against a catalogue or a specification.
The steps follow PLS-POLE: build the pole and its framing first, then attach loads to it.
Pole — length, embedment, diameters, shape and minimum ground clearance.Pole framing — the holes P1, P2… drilled on the pole: distance from the tip and the side of the pole.Parts library — define each part once: pin, suspension, post and dead-end insulators, crossarm, davit arm, brace. Save your standards to the site.Assemblies (optional) — construction units made of library parts, e.g. a crossarm with its pins.Conductors — library, or your own custom conductors.Design basis & wind — NESC 2017 Rule 250 or ASCE Manual 74, Kz and gust factor, how M_T and M_L combine.Geometry — attach parts and assemblies to the holes; name the points you will load.Loading — attach conductor loads (with the line angle and tension settings) and point loads to the holes and points.Load cases — NESC or ASCE templates or your own, including broken-wire cases.Press Calculate . Click any ? (or click into a field) to open its topic here, with typical values you can fill in with one click. If an input is missing or wrong, the list of problems appears here — click one to jump to the field.
Full screen gives the calculator the whole screen, so the toolbar and this panel stay in view while you work. Press Esc or Exit full screen to return to the page.
What the calculation doesGLM = Σ V·e + Σ Fwind ·h + Σ Ftension ·h + Σ Flong ·h + Fpole ·z̄ Tip load = GLM ÷ (L − Y − a)
This is a load-tree generator: it gives first-order loads only. Second-order (P-Δ) effects and the pole's capacity are left to the pole supplier or a structural analysis.
Each load is multiplied by its case load factor. Wind on wires and wire tension at a line angle usually make up most of the moment; on a tangent pole with no angle, wind dominates.
Biggest influencesWind speed or pressure (moment grows with V²) Wind span and number of conductors Line angle × wire tension Load factors (Grade B 250B uses 2.5 on wind) ← How to use Reading the resultsF_T = wind + tension 2.00 (w 1.20 + t 0.80) V F_L Same direction → added · ⊙ +L, ⊗ −L · no resultant arrow The headline is the tip load of the governing case (largest design moment), in kN with kgf and lbf beside it. Compare it with the pole's rated tip load at the same point below the tip — usually 2 ft (0.61 m) — or give the load tree to the pole supplier.
GLM — first-order moment from the factored loads (no P-Δ).Arrows — all drawn the same length: the label carries the value, the arrow the direction. Forces are added by direction : at each point one transverse arrow F_T = wind + tension (orange; the label shows w + t), the longitudinal F_L (purple, ⊙/⊗ in the elevation) and the vertical V. No resultant arrow.Plan at groundline — the total transverse ΣF_T and longitudinal ΣF_L arrows, with a table of each source (wire wind, wire tension, longitudinal, point loads, pole wind) in T and L.Load cases table — the moment from each source for every case; the governing row is highlighted.Load tree — factored forces at each attachment for the case you pick, as drawn and as a table. This is what goes to a pole supplier.Wire T used — the larger of the initial and final tension; % RBS flags wires above 60%. If the tip load is too highShorten the wind span or the ruling span. Reduce the line angle, or guy the pole at angles. Lower the attachment heights, or choose a stronger pole class. Results are factored loads. If your supplier quotes an unfactored working load, set every load factor to 1.0 and apply their safety factor (or the design multiplier) instead.
← How to use Length unitPole length, embedment, the tip-load point and the attachment distances use this unit. Spans, offsets and diameters stay metric. Switching converts the values already entered (1 ft = 0.3048 m exactly).
← How to use Pole length, LOverall length, tip to butt (nominal catalogue length).
Enter the full length including the part in the ground (for a base-plate pole, the length above the base plate). If an extension or bayonet carries the shield wire above the pole top, keep L as the pole length and give that wire a negative distance from tip.
Unit ft
35 ft 40 ft 45 ft 50 ft 60 ft 80 ft 85 ft
Unit m
9 m 10.5 m 12 m 13.5 m 15 m 18 m
← How to use Embedment depth, YRule of thumb: 10% of pole length + 2 ft (0.61 m).
Depth of the pole below groundline. It sets the height above ground H = L − Y, the lever arm for every load.
With “Use 10% of L + 2 ft” ticked, Y follows the rule and updates when L changes. Type a value in Y (or untick) to override it — for rock, a concrete-backfilled hole, or a utility standard. For a pole bolted to a foundation choose Installation: Base plate (Y = 0).
To check that the soil resists the moment, use the Pole Embedment calculator with Md or the tip load from here.
Use the rule
← How to use InstallationDirectly embedded — wood, concrete or steel set in the ground; moments are taken at groundline.
Base plate on foundation — steel or concrete pole bolted to anchor bolts. There is no embedment (Y = 0): the whole length is above the base, and the moment and tip load are at the base plate. If the foundation pier stands above the ground, enter the height of the base plate above ground: wind heights (Kz, gust factor, clearance) are measured from the ground, lever arms from the base plate.
Directly embedded Base plate
← How to use Tip-load point (fixed 2 ft below the tip)Pole ratings (ANSI O5.1, steel and concrete catalogues) apply the load 2 ft / 0.61 m below the tip.
Tip load = GLM ÷ (L − Y − 0.61 m). The point is fixed at 2 ft (0.6096 m) below the tip, the point pole classes and steel/concrete catalogues are rated at, so the tip load compares directly with a rating.
The pole-wind centroid is measured on the height above ground: z̄ = h(Dgl + 2A) / 3(Dgl + A), h = L − Y.
← How to use Tip and butt diametersData sheet: top diameter and butt (base) diameter, mm, across flats for polygonal poles.
Used only for wind on the pole: the exposed area is the trapezoid between the tip and the groundline diameter, with the taper assumed linear from tip to butt. Set both to 0 to leave pole wind out (the tip load is then low and not usable for pole selection).
80 ft steel 200 / 900 85 ft steel 380 / 900
← How to use Cross-section and force coefficientCf applied to wind on the pole in the wind-speed model only.
Section Cf Square (4 sides) 2.0 6 or 8 sides 1.4 12 sides 1.0 16 sides / circular 0.9
Circular 0.9 16-sided 0.9 12-sided 1.0 8-sided 1.4 Square 2.0
← How to use Line angle θ (per conductor load)Each conductor load has its own line: two circuits on one pole can turn by different angles, or cross. θ is the change of direction at the pole — the angle between the ahead span and the back span extended. The tension T in each span pulls along it; the two pulls add to a resultant that points into the angle, along the bisector:
Ft = 2·T·sin(θ/2) per conductor
At 5° that is about 9% of the tension per conductor; at 15°, 26%; at 30°, 52%. The plan in card 8 draws every line and its resultant.
0° tangent 5° 15° 30° 60°
← How to use Line bisector directionPlan — wind toward +T main line (along L) ρ = 0° crossing circuit (along T) ρ = 90° Main line: wind across it, ψ = 90° → full n·p·D·Sh Crossing circuit: wind along it, ψ = 0° → no wire wind Wind toward +L: the reverse. Check ±T and ±L (card 6). Wind on a wire = n·p·D·L·sin²ψ, square to the wire Which way this line turns, as the direction β of its bisector (where the tension resultant points). 0° = +T : the main line, running along ±L. 90° = +L : a circuit crossing the main line, running along ±T.
back span at β = 90° − θ/2 + ρ · ahead span at −(90° − θ/2) + ρ
Wind on the wire depends on the angle ψ between the wind and the line: n·p·D·Sh·sin²ψ, square to the line. Wind across the line (ψ = 90°) gives the full load; wind along the line gives none. So with the main line along L and a crossing circuit along T, wind toward +T loads the main line only, and wind toward +L loads the crossing circuit only. Check both with Wind directions in card 6 (±T and ±L, or all around).
Main line (0°) Crossing (90°) Turned the other way (180°)
← How to use Combining M_T and M_LEvery load is resolved into a moment about the transverse axis plane, MT (bending toward ±T) and the longitudinal plane, ML (bending toward ±L). On a round or polygonal pole the two add as vectors:
GLM = √(MT ² + ML ²)
Added takes |MT | + |ML |, a common hand-calculation shortcut — conservative, up to 41% higher when the two are equal. Both give the same answer when there is no longitudinal load.
← How to use Wind directionsPLS-POLE "Apply Negative Wind" (§5.4); wind at any angle to a wire acts on its normal component.
Plan — wind toward +T main line (along L) ρ = 0° crossing circuit (along T) ρ = 90° Main line: wind across it, ψ = 90° → full n·p·D·Sh Crossing circuit: wind along it, ψ = 0° → no wire wind Wind toward +L: the reverse. Check ±T and ±L (card 6). Wind on a wire = n·p·D·L·sin²ψ, square to the wire Each load case is run for every wind direction listed and the largest design moment is reported (the step-by-step names the governing direction and the next largest).
+T — wind along the main transverse axis only.±T — also from the other side: an arm on the windward side can reduce MT instead of adding to it.±T and ±L — four directions; use it when circuits run both ways (a crossing or a tap).All around — every 15° (24 directions); finds an oblique worst case.For each direction: wind on each wire is n·p·D·L·sin²ψ square to the wire (ψ = angle between wind and wire); pole wind, equipment wind and wind-tagged point loads act along the wind. Tension, weights and entered forces do not change.
±T ±T and ±L All around +T only
← How to use Design multiplierOptional factor on the final tip load, shown as a second "design tip load". For example, 1.25 on unfactored extreme-wind loads sets the pole's ultimate load. Leave 1.0 when the load factors already cover it.
1.00 1.25 1.50
← How to use Wire tensionState change : each conductor is strung at the initial tension (% of rated breaking strength) and temperature, bare. For every load case the final tension under that case's ice, wind and temperature is solved from the change-of-state equation over the attachment's ruling span:
T₂³ + A·T₂² − B = 0 A = EAα(t₂ − t₁) + (w₁·S)²EA/(24T₁²) − T₁, B = (w₂·S)²EA/24
The larger of the initial and final tension is used. Fixed : enter the design tension per conductor on each attachment (e.g. from a sag-tension run or the stringing chart).
25% RBS at 15 °C 20% at 25 °C 15% at 30 °C
← How to use Loading: conductor and point loadsPLS-POLE: wire and point loads applied at attachment points.
U1-PN1.E placement item in the assembly point P3 a hole on the pole DA1.E end of davit arm DA1 XA1.1 / XA1.2 the two crossarm ends XA1.B2 second hole along crossarm XA1 Phase A a name you gave a point Every load is attached to a point of the framing — a pole hole (P1, P2…) or a point of a placed part (DA1.E, U1-PN1.E, or a name you gave it in Geometry).
Conductor load — a wire (or bundle) at that point: conductor, number n, weight / wind / ruling spans, tension. When there is at least one conductor load, the line angle & wire tension settings appear above the list.Point load — equipment (weight + Cf·A) or a fixed force at that point.Up to 15 conductor loads and 15 point loads. Part weights from the parts library are added automatically.
← How to use ConductorPick from the library (typical values; check them against the conductor maker's data sheet) or define custom conductors in card 5 — they appear here under "Custom". Choose None for a load that only carries hardware or a longitudinal force.
← How to use Conductors at this pointMultiplies the wire weight, wind and tension at this attachment. Use 2 for a twin bundle, 3 when three phases hang from one crossarm at the same height, 0 for none.
1 2 (bundle) 3 (three phases)
← How to use Weight, wind and ruling spansWeight span — horizontal distance between the low points of the sags either side; carries the vertical load.Wind span — half the sum of the adjacent spans; carries the transverse wind.Ruling span — the equivalent span of the tension section, used for the state-change tension.On level ground with equal spans all three equal the span.
50 m 100 m 150 m 200 m 300 m
← How to use Design tension per conductorUsed when the tension method is Fixed . Enter the tension in one conductor in kN (kgf × 0.00981). For example, 1,800 kg for Condor is 17.66 kN, 800 kg is 7.85 kN and 400 kg is 3.92 kN.
3.92 kN (400 kg) 7.85 kN (800 kg) 17.66 kN (1,800 kg)
← How to use Hardware weightWeight of insulators, crossarm, brackets or equipment at this point, in newtons (kg × 9.81). It adds to the vertical load and only creates moment through the vertical offset.
← How to use Arm offset, rHorizontal distance from the pole centreline to the attachment (crossarm or davit length, bracket). The point sits at (r·cosβ, r·sinβ) in (T, L) with the azimuth β: its vertical load adds V·r·cosβ to MT and V·r·sinβ to ML , and horizontal loads at the arm tip twist the pole (torsion, reported). 0 for loads on the pole axis.
0 0.863 m 1.212 m (4 ft) 1.508 m 1.515 m (5 ft)
← How to use Azimuth, βPLS-POLE convention (§4.5): measured from the structure transverse axis +T, positive clockwise seen from above.
Direction of the arm (or point load) around the pole, in degrees.
β = 0° → +T · 90° → +L · 180° → −T · 270° (−90°) → −L
+T is the line-angle bisector — the side the angle tension and positive wind push toward; +L points toward the back span. An arm on the +T side (β = 0°) adds its weight moment to the wind; one at 180° subtracts from it. Use the 3D view to check.
0° (+T) 90° (+L) 180° (−T) 270° (−L) 45°
← How to use Wire directionLine through the pole — give this circuit's line angle θ and the direction of its bisector (0° = +T for the main line, 90° = +L for a crossing circuit). Tension adds 2·n·T·sin(θ/2) toward the bisector; wind is n·p·D·Sh·sin²ψ square to the line (full when the wind is across it — the usual hand method for the main line).
Span bearings — give the azimuth of each span leaving the pole. Leave one blank for a deadend. Use it for tap-offs, branch lines, deadends and double-circuit splits.
β = 0° → +T · 90° → +L · 180° → −T · 270° (−90°) → −L
Tension: n·T along each span (T from the change-of-state or fixed tension). Wind on each span: the normal component n·p·D·Ls·sin²ψ, ψ = angle between the wind and the span, Ls = its share of the wind span (half each with two spans, all of it with one). Example: deadend toward −L → back blank, ahead −90°. Tap leaving toward +T → back blank, ahead 0°.
Line through the pole Span bearings Deadend toward −L Tap toward +T Straight line (±L)
← How to use Point loadsAs PLS-POLE point loads (§5.3) and dead loads with drag areas (§4.9).
A concentrated load acting at a pole hole or a point of the framing (its height, offset r and azimuth β follow from that point).
β = 0° → +T · 90° → +L · 180° → −T · 270° (−90°) → −L
Force — V (positive down), FT and FL in N; or a horizontal magnitude H with its own bearing. Pick the load factor it takes in each case, or none if already factored. Forces tagged with a wind factor reverse with the wind.Equipment — weight W (kg) and Cf·A (m²): each case applies W·g × vertical factor, and the structure wind pressure × Cf·A × wire-wind factor along the wind (transformers, streetlights, signs, cameras).Moments: MT += FT ·h + V·r·cosβ, ML += FL ·h + V·r·sinβ.
Transformer 50 kVA (≈ 350 kg, Cf·A 0.5 m²) Streetlight bracket (25 kg, 0.15 m²) Guy-less service drop 1 kN toward +L
← How to use Longitudinal loadUnfactored load along the line at this point, in N: unbalanced tension between unequal spans, a broken-wire load, or the full pull at a deadend. It is multiplied by the case's longitudinal load factor.
← How to use Load casesNESC (ANSI C2) Rule 250B, 250C, 250D; load factors from NESC Table 253-1.
Add as many cases as you need (up to 8). Pick a template, grade and structure type, then Add . The template fills the case; every value stays editable, and you can rename it.
Template Wind Ice / temp 250B Heavy 190 Pa 12.5 mm, −20 °C 250B Medium 190 Pa 6.5 mm, −10 °C 250B Light 430 Pa 0, −1 °C 250C V with Kz, GRF 0, 15 °C 250D 110 Pa 0, −10 °C (Grade C ice ×0.8) ASCE extreme wind V (RP50) × γw 0, 15 °C ASCE ice + wind concurrent V map ice × γi, −10 °C
NESC 2017 does not require 250C and 250D when no part of the structure is more than 18 m (60 ft) above ground; such cases are still calculated and marked.
Untick Include to keep a case without running it.
← How to use Wind modelPressure : a fixed pressure on the projected area (NESC 250B district loads, 250D concurrent wind, or a pressure from your own code).
Wind speed : NESC 250C / ASCE Manual 74, p = 0.613·V²·Kz·(Kzt)·GRF·Cf·I·γw (Pa, V in m/s). Kz and the gust response factor vary with each wire's height and wind span (card 2 sets the method); the pole uses 0.67 of its height.
Pressure Wind speed
← How to use Wind pressureNESC Table 250-1: 190 Pa (4 lb/ft²) heavy and medium; 430 Pa (9 lb/ft²) light.
Applied to the iced diameter (D + 2t) of every wire and to the pole's projected area.
190 Pa 430 Pa 110 Pa (250D, 30 mph)
← How to use Basic wind speed3-second gust at 10 m, m/s. Use the value your code or utility standard gives for the site.
Pressure grows with V², so a 10% higher wind speed gives about 21% more wind moment. kph ÷ 3.6 = m/s.
63 m/s (227 kph) 250 kph 270 kph 300 kph 310 kph
← How to use Wire force coefficient and importance factorCf for round conductors is 1.0. The importance factor I scales the extreme-wind pressure; 1.0 unless your standard asks for a higher return period.
Cf 1.0, I 1.0
← How to use Radial ice thicknessIce adds weight (ρ = 913 kg/m³) and widens the wind area to D + 2t. Zero for the Philippines and other warm regions.
0 6.5 mm 12.5 mm
← How to use Case temperatureConductor temperature for this case. With the state-change tension, a colder case gives a higher tension, which raises the angle load.
−20 °C −10 °C −1 °C 10 °C 15 °C
← How to use Constant kNESC Table 250-1: 4.4 heavy, 2.9 medium, 0.73 light (N/m).
Added to the resultant wire load per metre in the state-change calculation (district loading only). 0 for extreme-wind and extreme-ice cases.
0 0.73 2.9 4.4
← How to use Load factorsNESC Table 253-1.
250B V Wind Tension Long. gen / DE Grade B 1.5 2.5 1.65 1.1 / 1.65 Grade C crossings 1.9 2.2 1.3 0 / 1.3 Grade C elsewhere 1.9 1.75 1.3 0 / 1.3
250C and 250D use 1.0, except wind 0.87 in 250C for Grade C. Pole wind takes the wind factor. Ice weight normally takes the vertical factor.
ASCE Manual 74 : the reliability factors γw and γi go in the case (wind force and ice thickness); load factors stay 1.0 except dead load. Manual 111 App. A uses 1.1 on dead load and 1.0 on ice weight.
250B Grade B tangent 250B Grade B deadend 250B Grade C elsewhere All 1.0 (unfactored) ASCE (App. A): DL 1.1, ice 1.0, wind 1.0
← How to use Design basisNESC 2017 Rule 250 / Table 253-1; ASCE Manual 74 (2010) Ch. 1–2, 4.
NESC : legislated loads. Kz and GRF use the NESC formulas (Exposure C, metric constants), with Kz not less than 0.85. Load factors come from Table 253-1 by grade.
ASCE Manual 74 : reliability-based loads. Choose the terrain exposure; Kz uses the power law of Table 2-1 with Kz constant below 33 ft (10 m); gust factors use Table 2-3. Reliability is set per case with γw (wind force) and γi (ice thickness), Tables 1-1 and 1-2.
Both use F = Q·Kz·V²·G·Cf·A with Q = 0.613 (SI).
NESC 2017 ASCE Manual 74
← How to use Heights below 10 m (33 ft)ASCE Manual 74: Kz and E are evaluated at 10 m for anything lower. ASCE Manual 111 Appendix A worked examples use the actual height.
Use 10 m (default) — the code rule: a wire or pole whose effective height is under 10 m is treated as 10 m for the terrain factor Kz and the exposure factor E.
Actual height — Kz = 2.01·(z/zg)^(2/α) and E at the real height, down to the ground. This gives lower wind on low wires and short poles; it is what the ASCE 111 Appendix A distribution example does (communication wire at 29 ft: Kz 0.975; pole at 25.8 ft: Kz 0.951), so use it to reproduce that example.
Use 10 m Actual height
← How to use Terrain exposureASCE Manual 74 §2.1.4.1 (from ASCE 7-05).
B — urban, suburban, wooded; obstructions the size of houses for at least 460 m upwind.C — open terrain with scattered obstructions under 9 m; farms, grassland. Use C unless B or D is clearly right.D — flat, unobstructed, wind off open water for at least 1.6 km; coastal shorelines.Exp. α zg κ Ls B 7.0 1200 ft 0.010 170 ft C 9.5 900 ft 0.005 220 ft D 11.5 700 ft 0.003 250 ft
B C D
← How to use Topographic factor, KztWind speed-up over isolated hills, ridges and escarpments (ASCE 7-05 method, Manual 74 §2.1.7.3). 1.0 on level ground; it need not be considered when H/Lh < 0.2 or the hill is under 4.5 m (Exposure C, D).
1.0
← How to use Kz and gust response factorFormula : Kz and GRF are calculated for each wire from its height and wind span, and for the pole from 0.67 of its height.
Table values : enter the values read from NESC Tables 250-2 and 250-3 (or your own), applied to all wires and to the structure — this is how hand calculations are usually done. Example 1/2 (80 ft pole, 200 m spans) use wire 1.2 / 0.75 and structure 1.1 / 0.93.
Formula Example 1/2 table values
← How to use Wire effective heightOwn height (NESC): each wire uses the height of its own attachment.
Average per conductor (ASCE Manual 74 §2.1.4.3): wires of the same conductor type share the average of their attachment heights, as in Manual 111 App. A. Moments still use each wire's own height.
← How to use Spans of the tension sectionRuling span = √(Σs³ / Σs) — ASCE Manual 74 Eq. 4-1.
List the span lengths between deadends, in metres, separated by commas. The ruling span is used for every attachment whose own ruling-span field is blank. It is not valid for unbalanced ice or span-specific loads.
← How to use Equipment wind areaProjected area × force coefficient of anything at this point that catches wind: crossarm, insulators, transformer, switch. It takes the structure gust factor and the wire wind load factor. Leave 0 to neglect, as both NESC examples do.
← How to use Insulator length and ground clearanceLength of a suspension insulator assembly hanging below the attachment. The lowest (attachment height − insulator length) is reported as the clearance at the structure and drawn on the pole, as in Example 1 (TM-1A, 2.5 ft → 49 ft clearance). Sag at mid-span is not included.
0.762 m (2.5 ft TM-1A)
← How to use Minimum ground clearanceThe clearance required at the structure for the voltage and what is crossed (NESC Table 232-1 / PEC). If set, the drawing and results flag a lower clearance. 0 = no check.
← How to use Reliability factors γw and γiASCE Manual 74 Tables 1-1 and 1-2 (50-year return period = 1.0).
RP, years γw (wind) γi (ice) 25 0.85 0.80 50 1.00 1.00 100 1.15 1.25 200 1.30 1.50 400 1.45 1.85
γw multiplies the wind force on wires and pole; γi multiplies the ice thickness before any load is computed. Both feed the wire tension. The concurrent wind with ice is not adjusted (γw = 1.0). For NESC 250D, Grade C uses an ice factor of 0.8.
RP50: 1.00 / 1.00 RP100 wind 1.15 RP200 wind 1.30 RP100 ice 1.25 RP200 ice 1.50 NESC 250D Grade C ice 0.8
← How to use Broken wireASCE Manual 74 §3.2 (longitudinal unbalanced loads), RUS Bulletin 1724E-200 §11, or your utility's failure-containment criteria.
A broken-wire case removes the tension of one or more wires on one side of an attachment. The other span keeps pulling, so the pole sees an unbalanced longitudinal load .
Broken conductor — the conductor load (card 8) whose wire breaks. One per case; add more cases for other wires.Broken span — back is the span on the +L side, ahead the span on the −L side. Breaking the back span leaves the ahead span pulling toward −L, and the other way round.Wires broken, nb — how many of the row's n wires break (1 for a single conductor; all sub-conductors for a bundle).Residual tension — the tension left in the broken span as a % of T (slack wire caught by the next structure, or a deadend that holds part of it). 0% is the usual assumption.Flost = nb · T · (1 − residual) removed along the broken span's direction
At line angle θ with the back span broken, the wire force at that row becomes (n − nb )·T on the back span plus n·T on the ahead span. Wind and weight on the broken span are kept, which is conservative. T is the case tension (state change or fixed) and is multiplied by the tension load factor.
Typical criteria: one conductor or shield wire broken, no wind, no ice, at about 15 °C (60 °F), load factors 1.0. Use the Broken wire case template.
Intact (no broken wire) Back span, 1 wire, no residual Ahead span, 1 wire, no residual
← How to use Framing: holes, parts, assemblies, geometrySame structure as PLS-POLE: pole attachment points, framing components defined once, then attached.
Holes card 2 Parts card 3 Assemblies card 4 (opt.) Geometry card 7: place Loading card 8: attach Pole framing (card 2) — holes P1, P2… on the pole: distance from the tip and the side β. On the pole face unless you enter an offset from the pole axis.Parts library (card 3) — each part defined once with its length, inclination, weight and holes.Assemblies (card 4, optional) — library parts fixed to each other, attached to the anchor @ or to another part's point.Geometry (card 7) — place parts and assemblies on the holes (or on points of placed parts) with a direction β. Name the points you will load.Loading (card 8) — attach conductor and point loads to the points.Davit, post, dead-end: E = B + ℓ·(cosα·cosβ, cosα·sinβ, sinα) Crossarm (end to end, pole at d₀ from end 1): end 1 = B − d₀·u, end 2 = B + (ℓ − d₀)·u Pin: E = B + ℓ up · Suspension: E = B − ℓ down · Brace: begin → end point
Point names: DA1.E (single-ended part), XA1.1 / XA1.2 (crossarm ends), XA1.B1… (holes), U1-PN1.E (part PN1 of assembly U1). Give any point a name such as “Phase A” in Geometry; the name shows in the lists, drawings and report.
Part weights become vertical loads at each part's centre; wind on parts is not included yet; suspension insulators hang plumb.
← How to use Pole holesPLS-POLE: pole attachment points (label, distance from top, orientation, offset).
Elevation Plan — seen from above groundline tip P1 P2 P3 from tip on the face of the pole +T β = 0° +L · β = 90° (back span) β = 180° β = 270° β Label — P1, P2… by default; rename freely (no dots or dashes).From tip — distance down from the pole top (negative = above, on an extension).Direction β — the side of the pole, from +T clockwise seen from above: 0° = +T, 90° = +L (back span), 180° = −T, 270° = −L.From pole axis — blank puts the hole on the pole face (half the diameter there, linear taper). Enter a distance to place it elsewhere: 0 on the axis, or the arm reach of a bracket that is not modelled as a part.+T face (0°) −T face (180°) +L face (90°) On the pole face
← How to use Parts libraryPLS-POLE framing components. Lengths in metres; weight in kg. Defined once, used in assemblies and in Geometry.
B E Pin insulator straight up B E Suspension hangs down α B E Post insulator along β, up α B E span Dead-end along the span 1 2 d₀ Crossarm end 1 → end 2 α E Davit arm along β, up α at to Brace no length attached here (B) end point (E, 1, 2) Pin insulator — straight up from where it is attached (usually a crossarm end or hole).Suspension insulator — hangs straight down (usually from a davit or crossarm end).Post insulator — along its direction β, rising at α: horizontal line post α ≈ 0–15°, vertical post α = 90°.Dead-end insulator — along β (usually the bearing of the span it holds), at α.Crossarm — defined end to end: ℓ is the total length, from end 1 to end 2. Where it is fixed to the pole is chosen when it is placed (Pole point from end 1 ; blank = middle), so one library crossarm serves centred and offset (side-arm) framing.Davit arm — from where it is attached, along β, rising at α (negative = drooping).Brace — no length: it runs from the point it is attached to, to the point you give for its other end; only its weight counts.Holes along the part on crossarms, davits, posts and dead-ends add attachment points named B1, B2… (crossarm: measured from end 1).
Horizontal Upswept 15° Vertical post 90°
← How to use Holes along a partExtra attachment points on crossarms, davit arms, posts and strain insulators — like PLS-POLE attachment points along a framing member.
B1 B2 B3 B4 XA1.1 XA1.2 pole 0.9 m d₀ (set in Geometry) Holes 0.2, 2.2, 0.9, 1.5 → B1 B2 B3 B4 (from end 1) List distances in metres from the part's begin point , separated by commas. Each one becomes an attachment point named label.B1 , label.B2 … in the order entered, which wires and other parts can attach to.
Crossarm — measured from end 1 toward end 2, 0 to ℓ. On a 2.4 m arm, 0.15 and 2.25 are near the ends and 1.2 is the middle.Davit arm, post, strain insulator — measured along the member from its begin point, 0 to ℓ, following its inclination.Bᵢ = B + dᵢ · (cosα·cosβ, cosα·sinβ, sinα) (crossarm: from end 1, α = 0)
Example: a 2.4 m crossarm with pins 0.2 m in from each end and a brace hole 0.9 m in → 0.2, 2.2, 0.9, 1.5. Ends 1 and 2 stay available.
2.4 m arm: pins near ends Three on an arm None
← How to use More pole holes: @2, @3, @4For assembly parts that reach back to the pole — a crossarm brace, a second bracket.
@ anchor = the hole you place it on XA.1 XA.2 PN1.E PN2.E XA BR @2 XA Crossarm 8 ft at @ PN1 Pin 15 kV at XA.1 PN2 Pin 15 kV at XA.2 BR Brace XA.B1 → @2 Placed as U1: @ = P5, @2 = P6 → U1-XA.1, U1-PN1.E… An assembly does not know which pole it will go on, so it cannot name a pole hole. Instead it uses anchors: @ is the hole it is placed on; @2 , @3 and @4 are more pole holes.
Example — crossarm with two braces: XA at @, BR1 from XA.B1 to @2 , BR2 from XA.B2 to @2 . Place it with Attached to = P5 and @2 = P6: the braces run from the crossarm holes down to hole P6 on the pole, with P6's own height, direction and offset.
The placement asks only for the anchors the assembly uses. In the assembly preview (card 4) @2… are drawn 0.6 m apart below @, as stand-ins.
← How to use AssembliesA reusable group of library parts — like a standard construction unit (e.g. a crossarm assembly with its pins and bracket).
@ anchor = the hole you place it on XA.1 XA.2 PN1.E PN2.E XA BR @2 XA Crossarm 8 ft at @ PN1 Pin 15 kV at XA.1 PN2 Pin 15 kV at XA.2 BR Brace XA.B1 → @2 Placed as U1: @ = P5, @2 = P6 → U1-XA.1, U1-PN1.E… Each row is one library part in the assembly:
Label — short name inside the assembly (XA, PN1). No dots or dashes.Part — from the parts library (card 3).Attached to — @ is the assembly's anchor: the hole or point you place it on. Other parts attach to a point of another row: XA.1, XA.2, XA.B1, DA.E…Brace end at (braces) — the point its other end attaches to. A brace that goes back to the pole uses @2 (or @3, @4): another pole hole, chosen when the assembly is placed.Pole point from end 1 (crossarms) — where the arm is fixed to the pole point, measured from end 1; blank = middle.β (relative) — direction relative to the placement. Placing the assembly with β = 90° turns every part by 90°.α override — blank uses the library part's inclination.While you edit an assembly, the preview shows it alone, hung at a hole facing +T.
← How to use Geometry: placing parts and assembliesPLS-POLE: attach a framing component's begin point to a pole attachment point, with its direction.
P2 DA1 SI1 “69 kV Phase A” = SI1.E (named) P5 U1-PN1.E U1-PN2.E U1-XA.B1 P6 BR1 DA1 Davit at P2 SI1 Suspens. at DA1.E U1 XA unit at P5 BR1 Brace P6 → U1-XA.B1 Label — filled in from what you place (DA1, XA1, U1…); rename freely. Its points are DA1.E, XA1.1, XA1.B1…; for an assembly U1-XA.1, U1-PN1.E…Place — a library part or an assembly.Attached to — a pole hole, or a point of something already placed (e.g. a suspension insulator on DA1.E).Brace end at (braces) — the other end, e.g. a crossarm hole.Pole point from end 1 (crossarms) — where along the arm it meets the hole; blank = middle.Direction β — from +T clockwise seen from above (0° = +T, 90° = +L back span). For an assembly it turns all its parts.Name its points — give points a name such as “Phase A”; Loading lists named points first.Toward +T (0°) Toward −T (180°) Along the line (90°)
← How to use Saved librarySaved on this site per user; administrators can publish site standards.
Save to library (on a part or assembly) stores it in your library on this site — log in first. Saving again with the same name updates it.Save as site standard (administrators) makes it available to every visitor, e.g. your utility's construction units.Saved library → Add to this calculation copies a saved part, or an assembly together with the parts it uses, into the parts library and assemblies (cards 3 and 4). A part with the same name and definition is reused; a different one is renamed.Export file / Import file save or load all the parts and assemblies of this calculation as a .json file — works without logging in.← How to use Attached toHole label, or part label + point: XA1.1, XA1.2, XA1.B1, DA1.E.
U1-PN1.E placement item in the assembly point P3 a hole on the pole DA1.E end of davit arm DA1 XA1.1 / XA1.2 the two crossarm ends XA1.B2 second hole along crossarm XA1 Phase A a name you gave a point Pick the pole hole or framing point. The list shows pole holes first, then points you have named, then every other point of the placed parts (with the part and which end). A part never lists its own points. If the hole or part is deleted the choice shows “missing” and is flagged in the issue list.
← How to use ConductorsData sheet: overall diameter, mass per km (÷ 1000 = kg/m), total area, final modulus, coefficient of expansion, rated breaking strength.
Add as many custom conductors as you need (up to 10) with + Add custom conductor , or choose + New custom conductor… in an attachment's conductor list. Start from copies a library conductor so you only change what differs.
Diameter and weight — always needed (wind and vertical loads).Area, modulus, expansion, RBS — needed only for the state-change tension (any line angle). Leave blank for communication cables on tangent poles.Renaming a custom conductor keeps it selected in every attachment that uses it.